This platform features the six new PECI electricity projects, resulting from the 2024 PECI selection.
E01 / Increasing the capacity of existing 220 kV interconnection between Bosnia and Herzegovina and Montenegro, 220 kV OHL Trebinje – PerućicaBosnia Herzegovina / Montenegro
Show on map
Replacement of the conductors on the existing overhead line 220 kV Trebinje – Perućica with the High Temperature Low Sag (HTLS) conductors, increasing the transmission capacity of the transmission line. ![]() |
Electricity Transmission 007cb59106c44414876231e9157de8f6 All in Electricity 3a37e1daba764d02bb672c2f6f94c1ae |
E04 / Trans Balkan Corridor: Double OHL 400 kV BA and ME sectionsBosnia Herzegovina / Montenegro
Show on map
Finalisation of the Trans Balkan Corridor (section 4) on the sides of Bosnia and Herzegovina (OHL 400 kV Bajina Basta/Serbia – Visegrad/Bosnia and Herzegovina) and Montenegro (OHL 400 kV Bajina Basta/Serbia – Pljevlja/Montenegro). ![]() |
Electricity Transmission 007cb59106c44414876231e9157de8f6 All in Electricity 3a37e1daba764d02bb672c2f6f94c1ae |
E06 / Reconfiguration of 400 kV grid, new 400 kV interconnection AL - XKAlbania / Kosovo*
Show on map
Internal transmission network reinforcements in Albania and Kosovo* and the new 400 kV interconnection line Prizren 4 – Fierza. ![]() |
Electricity Transmission 007cb59106c44414876231e9157de8f6 All in Electricity 3a37e1daba764d02bb672c2f6f94c1ae |
E08 / 330 kV OHL Balti (MD) - Dnestrovsk HPP-2 (UA)Moldova / Ukraine
Show on map
The second 330 kV line between substations Balti in Moldova and HPP Dnestrovsk in Ukraine shall strengthen interconnections between these two countries. ![]() |
Electricity Transmission 007cb59106c44414876231e9157de8f6 All in Electricity 3a37e1daba764d02bb672c2f6f94c1ae |
E07 / Closing the 400 kV Albanian internal ringAlbania
Show on map
New internal transmission line 400 kV Rrashbull – Fier and extension of the substations Rrashbull and Fier with 400 kV voltage level ![]() |
Electricity Transmission 007cb59106c44414876231e9157de8f6 All in Electricity 3a37e1daba764d02bb672c2f6f94c1ae |
E13 / DTEK storage 225 MWUkraine
Show on map
Large BESS located in Ukraine will provide the frequency containment reserve (FCR) and automatic frequency restoration reserve (aFRR) to the Ukrainian and Moldovan control block, thus contributing to the balancing of the control block and stabilising the frequency in Continental Europe. ![]() |
Electricity Storage 2f8c124b13a444b997d0ea2e20b36c5d All in Electricity 3a37e1daba764d02bb672c2f6f94c1ae |